Description:
WestBowPress, 2017-07-18. Paperback. Good. 0.3200 in x 9.0000 in x 6.0000 in. This is a used book in good condition and may show some signs of use or wear .
Home
Manual critical path techniques for construction by COLLINS F T - 1965
Manual critical path techniques for construction by COLLINS F T - 1965
by COLLINS F T
Manual critical path techniques for construction
by COLLINS F T
- Used
- good
- Paperback
- first
1965. 1st Edition . Paperback. Good. QUARTO. Ex-institutional library but ow solid clean and tight - usual stamps on prelim pages 193 pages
- Bookseller Green Ink Booksellers (GB)
- Format/Binding Paperback
- Book Condition Used - Good
- Quantity Available 1
- Edition 1st Edition
- Binding Paperback
- Date Published 1965
- Product_type
Stock Photo: Cover May Be Different
The Storm
by Collins, Martha T. F
- Used
- good
- Paperback
- Condition
- Used - Good
- Binding
- Paperback
- ISBN 10 / ISBN 13
- 9781512795790 / 1512795798
- Quantity Available
- 1
- Seller
-
Springdale, Arkansas, United States
- Item Price
-
A$17.40
Show Details
Item Price
A$17.40
Physics Today - November 1994, Volume 47, Number 11: "Human Impacts On The Nitrogen Cycle", et al.
by Charles Harris (Publisher); Gloria B. Lubkin (Editorial Director); Stephen G. Benka (Editor); Denis F. Cioffi, Graham P. Collins, Irwin Goodwin, et al. (Editors); Robert H. Socolow, Ann P. Binzig, Jeffrey T. Kiehl, et al. (Contributors)
- Used
- very good
- Paperback
- Condition
- Used - Very Good
- Edition
- November 1994, Volume 47, No. 11
- Binding
- Paperback
- Quantity Available
- 1
- Seller
-
The Bronx, New York, United States
- Item Price
-
A$18.76
Show Details
Description:
Woodbury, NY: American Institute of Physics, 1994. November 1994, Volume 47, No. 11 . Soft Cover . Very Good. 4to or 4° (Quarto): over 9¾" x 12" tall. 144 pp. November 1994, Vol. 47, Number 11 issue only! Over-sized and/or over weight book; may require extra postage. Please note that large and/or heavy items may incur an additional shipping charge. A great, almost spotlessly clean copy! Solidly and tightly bound, essentially and nearly flawless copy with minimal internal and external wear and use. Copy with crisp pages, clean text, and light shelf wear. Smooth covers. Light foxing on page edges, not affecting text.
Item Price
A$18.76
Transport Organisation in a Great City: The Case of London
by Collins, M.F., Pharoah, T.M
- Used
- Hardcover
- Condition
- Used
- Binding
- Hardcover
- ISBN 10 / ISBN 13
- 9780043800188 / 0043800181
- Quantity Available
- 1
- Seller
-
Lincoln, Lincolnshire, Aberdeen, United Kingdom
- Item Price
-
A$3.85
Show Details
Description:
Allen & Unwin, 1974. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. In good all round condition. No dust jacket. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,1250grams, ISBN:0043800181
Item Price
A$3.85
Stock Photo: Cover May Be Different
Sport and Social Exclusion
by Collins, M.F. and Kay, T
- Used
- Paperback
- Condition
- Used
- Binding
- Paperback
- ISBN 10 / ISBN 13
- 9780415259590 / 0415259592
- Quantity Available
- 1
- Seller
-
Lincoln, Lincolnshire, Aberdeen, United Kingdom
- Item Price
-
A$3.85
Show Details
Description:
Routledge, 2003. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In good all round condition. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,600grams, ISBN:9780415259590
Item Price
A$3.85
Stock Photo: Cover May Be Different
Sport and Social Exclusion
by Collins, M.F. and Kay, T
- Used
- Paperback
- Condition
- Used
- Binding
- Paperback
- ISBN 10 / ISBN 13
- 9780415259590 / 0415259592
- Quantity Available
- 1
- Seller
-
Lincoln, Lincolnshire, Aberdeen, United Kingdom
- Item Price
-
A$3.85
Show Details
Description:
Routledge, 2005. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In poor condition, suitable as a reading copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,600grams, ISBN:0415259592
Item Price
A$3.85
Stock Photo: Cover May Be Different
Sport and Social Exclusion
by Collins, M, F. and Kay, T
- Used
- Paperback
- Condition
- Used
- Binding
- Paperback
- ISBN 10 / ISBN 13
- 9780415259590 / 0415259592
- Quantity Available
- 1
- Seller
-
Lincoln, Lincolnshire, Aberdeen, United Kingdom
- Item Price
-
A$3.85
Show Details
Description:
Routledge, 2003. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In good all round condition. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,600grams, ISBN:9780415259590
Item Price
A$3.85
Stock Photo: Cover May Be Different
Sport and Social Exclusion
by Collins, M.F. and Kay, T
- Used
- Paperback
- Condition
- Used
- Binding
- Paperback
- ISBN 10 / ISBN 13
- 9780415259590 / 0415259592
- Quantity Available
- 1
- Seller
-
Lincoln, Lincolnshire, Aberdeen, United Kingdom
- Item Price
-
A$3.85
Show Details
Description:
Routledge, 2003. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In good all round condition. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,600grams, ISBN:9780415259590
Item Price
A$3.85
Stock Photo: Cover May Be Different
Sport and Social Exclusion
by Collins, M.F. and Kay, T
- Used
- Paperback
- Condition
- Used
- Binding
- Paperback
- ISBN 10 / ISBN 13
- 9780415259590 / 0415259592
- Quantity Available
- 1
- Seller
-
Lincoln, Lincolnshire, Aberdeen, United Kingdom
- Item Price
-
A$3.85
Show Details
Description:
Routledge, 2005. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In fair condition, suitable as a study copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,600grams, ISBN:0415259592
Item Price
A$3.85
Stock Photo: Cover May Be Different
Sport and Social Exclusion
by Collins, M.F. and Kay, T
- Used
- Paperback
- Condition
- Used
- Binding
- Paperback
- ISBN 10 / ISBN 13
- 9780415259590 / 0415259592
- Quantity Available
- 1
- Seller
-
Lincoln, Lincolnshire, Aberdeen, United Kingdom
- Item Price
-
A$3.85
Show Details
Description:
Routledge, 2005. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In fair condition, suitable as a study copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,600grams, ISBN:0415259592
Item Price
A$3.85
Stock Photo: Cover May Be Different
Guided Weapons (Land Warfare, Brassey's New Battlefield Weapons Systems and Technology Series Into the 21st Century, V. 5)
by T. K. Garland-Collins; C. A. Sparkes; R. G. Lee; Editor-R. G. Lee; Editor-J. F. Rouse
- Used
- Hardcover
- Condition
- Used: Good
- Binding
- Hardcover
- ISBN 10 / ISBN 13
- 9781857531527 / 1857531523
- Quantity Available
- 1
- Seller
-
HOUSTON, Texas, United States
- Item Price
-
A$30.06
Show Details
Description:
Brasseys UK Ltd, 1997-12. Hardcover. Used: Good.
Item Price
A$30.06