BIBLIO is the largest independent book marketplace in the world, with over 100 million books.

Skip to content

Construction Delay Analysis Techniques

Construction Delay Analysis Techniques

Construction Delay Analysis Techniques Paperback - 2010

by Khalid S. Al-Gahtani

Add to wish list
  • New
  • Paperback
New

Description

Paperback. New. New Book; Fast Shipping from UK; Not signed; Not First Edition; At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, becau
Ask the seller a question Add to wish list
A$130.48
A$15.46 Delivery to USA
Standard delivery: 7 to 12 days
More delivery options
Ships from Ria Christie Collections (Greater London, United Kingdom)

Details

  • Title Construction Delay Analysis Techniques
  • Author Khalid S. Al-Gahtani
  • Binding Paperback
  • Condition New
  • Pages 324
  • Volumes 1
  • Language ENG
  • Publisher LAP Lambert Academic Publishing
  • Publication date 2010-12-13
  • Bookseller's Inventory # ria9783843350709_inp
  • ISBN 9783843350709 / 3843350701
  • Weight 1.05 lbs (0.48 kg)
  • Dimensions 9 x 6 x 0.73 in (22.86 x 15.24 x 1.85 cm)
  • Category Technology & Industrial Arts
  • Quantity available 754

About Ria Christie Collections Greater London, United Kingdom

Biblio member since 2014

Hello We are professional online booksellers. We sell mostly new books and textbooks and we do our best to provide a competitive price. We are based in Greater London, UK. We pride ourselves by providing a good customer service throughout, shipping the items quickly and replying to customer queries promptly. Ria Christie Collections

Terms of Sale:

30 day return guarantee, with full refund including original shipping costs for up to 30 days after delivery if an item arrives misdescribed or damaged.

Browse books from Ria Christie Collections

Reader reviews for Construction Delay Analysis Techniques

From the publisher

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.
tracking-